This pix is of the lower frame built and the front panel mounted.. I am building this chassis large so that I will have enough room for the large bargraph display to be mounted and for all the linkage for the upper tuning rods...The next step is to build up the upper tuning worm gear assembly which has to be insulated from the plate High Voltage..Once this is all built then the upper chassis frame can be constructed..