New building-2Another view of the shack being worked on, notice the new solar panels on the roof..
Date: 09/27/2007
Another view of the shack being worked on, notice the new solar panels on the roof..
New building-3A view a worker installing ant leads to the bulk head poly-phaser grounding system..
Date: 09/27/2007
A view a worker installing ant leads to the bulk head poly-phaser grounding system..
Ant feed line connectionA close up view of the grounding system for all the ant lead connections.. The VE6VHF repeater connections are at the top left...
Date: 09/27/2007
A close up view of the grounding system for all the ant lead connections.. The VE6VHF repeater connections are at the top left...
Ant ports insideThis is a view of all the ant ports inside the building and the cable tray..
Date: 09/27/2007
This is a view of all the ant ports inside the building and the cable tray..
Rack power connectionA view of the top of the equipment racks showing the cable tray along the top and the individual breakered DC power connections for each rack..The VE6VHF repeater is in rack -2 space
Date: 09/27/2007
A view of the top of the equipment racks showing the cable tray along the top and the individual breakered DC power connections for each rack..The VE6VHF repeater is in rack -2 space
VE6VHF repeaterA pix of the VE6VHF repeater looking through the door of the building..
Date: 09/27/2007
A pix of the VE6VHF repeater looking through the door of the building..
Front of racksA view of the front of the equipment racks..
Date: 09/27/2007
A view of the front of the equipment racks..
Back of racksA view of the rear side of the racks...
Date: 09/27/2007
A view of the rear side of the racks...
Battery storageAll the batteries are stored in their own compartments along the back wall..
Date: 09/27/2007
All the batteries are stored in their own compartments along the back wall..
DC breaker panelThis view shows the main DC power breaker panel and more of the battery compartments along the wall.
Date: 09/27/2007
This view shows the main DC power breaker panel and more of the battery compartments along the wall.
TIG generatorsThis view shows the T.I.G. power generators being installed in the new location..These generators supply the main DC power to the building from propane burning..
Date: 09/27/2007
This view shows the T.I.G. power generators being installed in the new location..These generators supply the main DC power to the building from propane burning..